kostmayer_maritime_facility_aerial_after

Maritime Facility

Kostmayer demolished the unsalvageable sections of the existing dock and rebuilt the dock with pieces fabricated concurrently in their fabrication yard. The dock’s construction had numerous challenging obstacles including starting with underwater demolition of the pilings that required cutting them at the mud line.